Replacing structured packing in an existing tower is critical for maintaining optimal separation efficiency, especially as packing ages or performance degrades. Follow this systematic guide to ensure a safe, efficient replacement.
1. Pre-Installation Preparation
First, shut down the tower, isolate it from the system, and drain residual fluids. Conduct a thorough risk assessment: wear PPE (gloves, goggles, respiratory gear) and use lockout-tagout procedures to prevent accidental startup. Gather tools: crane (for heavy packing), torque wrench, new packing, gaskets, and cleaning supplies. Verify new packing matches original specs (material, size, geometry).
/微信图片_20240524140112 (9).png)
2. Remove Old Packing
Lower the packing in sections, starting from the top. Use a crane to lift heavy sections; for small towers, remove packing manually, taking care not to damage tower walls or internals like support grids. Collect debris and old packing for disposal. Inspect the tower’s internal surface for cracks, corrosion, or deposits—these must be repaired before installation.
3. Inspect tower internals
Check support grids, liquid distributors, and gas risers for wear. Ensure grids are level and secure, and distributors have unclogged nozzles. Replace damaged parts immediately; even minor issues can compromise new packing performance. Clean all internal surfaces with approved solvents to remove scale or residue.
4. Install New Structured Packing
Start by placing a new base grid, securing it with the torque wrench to specs. Install packing layers, aligning rows carefully to maintain the required angle (typically 90° for standard designs). For optimal flow, stagger each layer by 30° from the layer below. Use spacers to ensure uniform packing height, and avoid compressing the packing beyond its design limits.
5. Finalize and Test
Replace upper grids and gaskets, tightening all fasteners to prevent leaks. Reassemble tower components and gradually repressurize the system. Perform a pressure drop test to ensure flow distribution matches design values. Run a short efficiency test (e.g., for distillation, measure separation of a test mixture) to confirm performance.
/1 (108).jpg)
Conclusion
Proper structured packing replacement requires careful planning, attention to detail, and adherence to safety protocols. By following these steps, you can restore tower efficiency and extend the life of your distillation or absorption system. Always consult manufacturer guidelines for your specific packing type and tower model.