Fluid maldistribution in packed towers significantly reduces separation efficiency, leading to energy waste and product quality issues. Proper structured packing installation is critical to avoid this. Here are key steps to minimize maldistribution: First, prepare the tower: inspect internal surfaces for debris, confirm tower alignment, and measure packing height accurately. Clean all tower internals, including support grids and distributors, to prevent blockages. Next, install the support grid system. Ensure it’s level using a spirit level; uneven grids cause uneven packing settlement and fluid pooling. Securely fasten grid components with anti-vibration fasteners to avoid shifting during operation. Then, install structured packing layer by layer. Align each layer with vertical reference lines or guides to maintain uniform spacing. Use a calibrated tool to check layer flatness; gaps between layers or misaligned packing can create dead zones or channeling. After packing, install the liquid distributor. Ensure its nozzles are at the correct height and angle to disperse liquid evenly across the packing cross-section. Test distributor flow rates to confirm uniform distribution. Finally, conduct post-installation checks: verify packing height consistency, inspect for any physical damage, and perform a small-flow test to observe fluid distribution patterns. Adjust if maldistribution is detected. By following these steps, you ensure structured packing operates optimally, minimizing fluid maldistribution and maximizing tower performance.
/1 (122).jpg)
/1 (13).jpg)
/1 (128).jpg)