structured packing, a critical tower internal in chemical processing, is prone to fluid channeling—where fluids flow unevenly through gaps, reducing separation efficiency. Proper installation is key to preventing this. Start with pre-installation checks: inspect packing elements for damage, clean the tower interior to remove debris, and verify the tower’s verticality. Use precision tools to ensure support grids or bed plates are perfectly level, as even minor inclines can cause uneven packing compression. When laying packing, align layers strictly along tower axes, avoiding folds or overlaps. Tap gently to settle the packing and eliminate air pockets, ensuring uniform density. Maintain a consistent radial gap between packing and tower walls (typically 1-2mm) using spacers; gaps here can fuel channeling. Secure packing sections with tie rods or clips, but avoid over-tightening to prevent element distortion. Finally, install the liquid distributor carefully, ensuring it sits flush and has even weir distribution—misalignment here causes uneven liquid flow, a primary cause of channeling. Post-installation, perform a leak test and simulate operation to confirm uniform fluid distribution. With these steps, structured packing installation avoids fluid channeling, maximizing tower efficiency.
/1 (152).jpg)
/1 (134).jpg)
/1 (147).jpg)