Installing structured packing in a high-temperature gas tower requires careful planning and precise execution to ensure optimal tower internal performance and long-term reliability. Follow these professional steps:
/1 (127).jpg)
1. Pre-Installation Preparation
First, inspect the tower thoroughly to ensure no debris, rust, or residues remain inside. Clean the tower internals using high-temperature resistant solvents if necessary. Check the structural integrity of the tower, including support plates and nozzles, to confirm they can bear the packing weight. Verify the packing specifications, such as material (e.g., metal, ceramic) and size, match the design requirements, especially for high-temperature resistance.
2. Structured Packing Handling
Handle the structured packing with care to avoid physical damage, which could affect gas-liquid distribution. Store packing in a dry, shaded area to prevent moisture absorption or contamination. When moving, use anti-static tools to avoid static buildup, critical for high-temperature environments.
3. Tower Internal Alignment
Install a centerline marker on the tower shell to guide vertical packing placement. Use a level and measuring tools to ensure the tower is plumb, as misalignment can cause uneven packing layers and poor separation efficiency. Securely mount support grids or bed plates at the designated height, ensuring they are flat and rigid to support the packing weight.
4. Layer-by-Layer Packing Installation
Start from the bottom of the tower and place the first packing layer horizontally, aligning it with the tower walls using spacers. Ensure each layer is compacted evenly to avoid gaps, which can disrupt gas flow. For multi-layer packing, stagger the packing elements between layers to enhance turbulence and improve mass transfer. Use a lifting frame or mechanical feeder to place the packing safely, avoiding compression that could damage the structured geometry.
/1 (104).jpg)
5. Packing Fixing and Sealing
After installing all packing layers, secure the top with a pressure plate or retaining ring to prevent movement during operation. Check the vertical height of the packing bed to ensure it meets design specifications. Apply high-temperature resistant sealant around the packing’s perimeter if needed, ensuring no gas bypasses the packing zone.
6. Post-Installation Inspection
/1 (3).jpg)
Perform a final inspection to confirm the packing is properly aligned, all tower internals are tight, and there are no leaks. Run a pre-operation test with inert gas to check for airflow resistance and pressure drops, which should align with calculated values. Monitor the packing during initial operation to detect any anomalies, such as excessive vibration or temperature fluctuations, and address them promptly.
By following these steps, you can ensure the structured packing operates efficiently in high-temperature gas towers, maximizing separation performance and extending the tower’s service life.