Installing structured packing in a high - speed fluid tower requires careful planning and precise execution to ensure optimal performance and longevity of the tower internal. First, prepare the tower: inspect the inner walls for any debris, ensure the support grids are clean and securely mounted, and gather necessary tools like lifting equipment, measuring tapes, and alignment tools. Next, check the packing quality: verify each packing sheet is undamaged, with consistent dimensions and proper spacing between metal or plastic elements. For high - speed fluid towers, uniform packing alignment is critical to prevent uneven flow and pressure drops. Then, start installing the first layer: place packing sheets horizontally, aligning their edges with the tower walls and using spacers to maintain the required gap. Secure each layer with clips or tie rods to prevent movement under high fluid velocity. After installing all layers, seal the top and bottom with a distribution grid to ensure fluid enters and exits evenly. Finally, perform a pre - operation test: run a low - flow fluid through the tower to check for leaks, measure pressure drops, and confirm packing alignment. Adjust as needed to meet high - speed flow requirements, ensuring the tower internal operates efficiently and safely.
/1 (134).jpg)
/1 (35).jpg)
/1 (105).jpg)